Direction of activities
CONSTRUCTION APPROVEMENT CERTIFICATE: BU19-716/21
- BA -3.1Construction, expansion and renovation of prefabricated and prefabricated reinforced concrete structures and complete cast-in-place structures
- BA -3.5Installa on of power transmission lines, substa ons and their equipment
- BA -6.3, BA -7.4Installation of ligh ng and power supply within the building, equipment, Outdoor branch sublines installation of the building
- BA -6.4, BA -7.4Installation of communication and alarm systems within the building,
Installation of fire extinguishing and fire alarm systems, internet network, their
equipment, outdoor branch subline of the building
DRAWING: ЗТ19-148/22
- BA -3.1
Indoorlighting, power supply system,outdoor branch network up to 35k V,related building technology design Automated design of residential, public, industrial building and equipment monitoring and measuring instruments
ENERGY CERTIFICATE: 2165/22
- ТЗ-2.2
0.4-35kV power transmission line, substation assembly and repair work, its testing and adjustment services
- ТЗ-6.1High voltage measurement, testing and calibration services
- ТЗ-6.2Relay protection automation measurement, test and adjustment work and service
COMMUNICATIONS REGULATORY COMMISSION OF MONGOLIA: 12100793
- Tower and installation of communication equipment on it
- Installation of external communication cable lines
MONGOLIAN AGENCY FOR STANDARTISION AND METROLOGY: 245
- Installation of electricity meters and current transformers
- BA -3.5Installa on of power transmission lines, substa ons and their equipment
RADIO FREQUENCY: 20511763
- Kenwood TH-K6AT /FM transceiver/ 5Вт А13780
- Kenwood TМ 471А /FM Dual-Bander/ 50Вт А20452